AgentPi

FarmTechTM AI Operations
Stopped
--
Agent
1060
Runs
37
Pending
$0.00
Last 24h

Needs Your Attention 37

CN1 GPS Extraction: Approval Needed for .NET Installation
high
Task #270 complete. Full solution documented in CN1_GPS_SOLUTION.md. RECOMMENDED PATH: OPTION 1 (Try First): - Install .NET 8.0 on Raspberry Pi (~500 MB) - Test C# CN1Extractor with CNHVoyager2.dll - Time: 1 hour | Success probability: 60% - If works: Full automation in AgentPi pipeline - If fails: CNHVoyager2.dll may be Windows-only OPTION 2 (Fallback): - Run C# extractor on your Windows PC - Transfer CSV to Pi for processing - Time: 2 hours setup | Success: 100% guaranteed - Manual step but gets 2025 harvest processed immediately OPTION 3 (Long-term): - Contact CNH for Linux ARM SDK build - Pursue in background while using Option 2 QUESTION: Should I install .NET 8.0 and test Option 1? See: /data/Sandbox/CNH/CN1_GPS_SOLUTION.md for full technical analysis
RTK Flatrate Subscription Renewal Decision
medium
Montana State Reference Network RTK Flatrate subscription (login: farmt21) expired 2025-08-22. Decide whether to renew if this service is still needed.
Review & Send: Topcon Program at BMO - Tamara Mallmann (BMO)
medium
Customer reply from Tamara Mallmann (VP, Program Manager Vendor Finance at BMO). She acknowledged Dougs news about Topcon distribution changes. Draft reply created and queued for review. **Thread Summary:** - BMO/Topcon vendor financing program - Tamara had requested dealer agreement be signed by 3/15 deadline - Doug explained FarmTechs Topcon distribution channel changed to new primary distributor (someone who used to work for both Topcon and Doug) - This ends a 17-year relationship with Topcon - Tamara: "I'm sorry to hear that." **Draft Status:** Ready for Doug to review and send (or modify) in draft_queue.json - Draft ID: d22259c5ef8894172b923 - To: tamara.mallmann@bmo.com
COMMS: Review old emails (Aug 2025) - 4 triaged
medium
Triaged 4 emails from August 2025: 1. **Jack Harris (Immigration Attorney)** - Form signature needed. Jack completed a form and needs Doug to review, sign, and answer follow-up questions. 2. **Meta Support** - Case 1121477969804352 closed due to inactivity. Can be reopened if needed. 3. **X (Twitter)** - Security notification for login from Shelby, MT on Aug 26. Appears legitimate. 4. **Docusign (Keiri Breding/Columbia Grain)** - Contract No. 1536295 awaiting Doug's e-signature. All other parties have completed. **NOTE:** These are 6+ month old emails. If these have already been completed/addressed, they can be archived.
Review QuickBooks State Retirement Mandate Compliance
medium
QuickBooks flagged that FarmTech may have employees in states with retirement savings mandates (Colorado, Connecticut, Maryland, Illinois, Oregon). Need to verify if FarmTech meets criteria for compliance and review required steps. Noncompliance can result in penalties up to $5,000 per state.
Review Draft: Re: Today's Morning Farm Report
medium
David Cimbalista replied to your Sept 2, 2025 email about weather data discrepancies with Agrible/EOS. Context: David found that EOS is reporting 0.0 inches of rain vs. your report showing 0.1 inches. He's investigating whether the location differential (farm center point vs. house, ~1 mile apart) explains the variance. Draft waiting for review in draft queue: draft-ed3dbb5cc0264b88 The draft asks clarifying questions about data verification methodology, location accuracy, and time-series validation to help track down the discrepancy.
LACOS AgSystems — Evaluation Units Reply (DRAFT READY)
medium
**Sender:** Mike SAUER (Mike.Sauer@lacos.de) | LACOS AgSystems **Context:** Positive response to Doug's inquiry about LACOS partnership. Mike is asking Doug to specify which steering system and display configuration to order as test units so he can get shipping quotes. **Key Points from Mike:** - Supports evaluation unit approach (test before full dealer agreement) - Steering systems with 3 display variants available (page 26+ of price list) - LC:TWO display NOT available until April - Willing to discuss dealer agreement AFTER evaluation succeeds - No current US dealers, so no territorial restrictions **Draft Status:** ✅ DRAFT CREATED and saved to draft_queue.json **Draft Action Items:** 1. Doug reviews draft reply (specifies evaluation units + asks shipping cost/timeline) 2. Doug approves or edits the draft 3. Doug sends when ready **Timeline:** Mike indicated he replied Monday (didn't get through initially). Ready to move forward quickly.
Verizon: Service suspension reminder
medium
Line 406.594.0431 suspended on 9/30/2025. Auto-reconnect on 12/29/2025. Can reconnect anytime via My Business portal. Verify if intentional.
Healthcare.gov: Pick 2026 Insurance Plan
medium
Healthcare.gov application submitted for Douglas & Cindi Weist. Your 2026 Marketplace eligibility results are ready. Next step: Log into healthcare.gov and select a health insurance plan.
Field Import Error: Johns Unc South (151.96 acres)
medium
Field import failed for "Johns Unc South" (151.96 acres, ID 44274). System could not auto-match to existing field. Your existing fields: - Als East (126.19 acres) - Als North1 (55.85 acres) - Als North2 (138.91 acres) - Daves North (161.16 acres) - T05, T07, T09 (various acres) - W02, W05, W07 (various acres) - Z09, Z02 (various acres) - G01, G02, W03 (0 acres - placeholder fields?) DECISION NEEDED: Reply to the Field Import Error email with ONE of: 1. "Replace Set ID: [NUMBER]" — to replace an existing field 2. "NONE" — to add as a completely new field Example: "Replace Set ID: 66627" would replace Als West
VERIFY: cropiq.us Domain Status
medium
GoDaddy email confirms cropiq.us renewal expired 11/28/2025 and domain set to delete on 12/18/2025. Since that date has passed (today is 3/4/2026), the domain has likely been deleted. Please verify if cropiq.us is still needed for FarmTech. If yes, contact GoDaddy (Customer #29299465) for emergency restoration. If not needed, can be disregarded.
DRAFT: Peter Jupp follow-up on G01 yield data
medium
Peter (Messium) followed up on the G01 yield data issue from Dec. Issue: missing data gaps in yield data. Doug said he would look into it in early December but never replied. Draft response created for review — acknowledges delay, commits to investigating by end of week. Draft ID: d-d5fdd71462c04ba0 Thread: 19ad9aa69aade7ec From: peter@messium.co.uk
COMMS: Review and approve draft reply to Cody Townsend (FarmTech Solutions legal)
medium
Email from Cody Townsend (Cody@mttaxlaw.com) — Re: FarmTech Solutions, Inc. - Address Clarification Thread context: - Cody asking about investor timeline (end of January for decision, end of February for completion) - Doug already replied with timeline - Cody sent follow-ups asking about David Cimbalista email and confirming bylaws/minutes for signatures - Doug confirmed David is cc'd Draft reply created: Acknowledges double email, confirms timeline for Confidential Offering Memorandum (end of week/early next week), commits to reviewing Memo questions and other documents, and indicates willingness to e-sign bylaws/minutes quickly. Action items: 1. Review the draft in draft_queue.json (draft_id: draft_20260304_cody_townsend_reply) 2. Make any edits if needed 3. Approve to send when ready Thread ID: 19b6fd1fdc6f0600 Email ID: 19b9b4696e6c1ffa
CUSTOMER REPLY: Cody Townsend — FarmTech Solutions legal docs
medium
**From:** Cody Townsend <Cody@mttaxlaw.com> **Date:** Jan 8, 2026 **Summary:** Cody sent a follow-up acknowledging a double email. Key updates: - Confidential Offering Memorandum: Expects by end of this week or early next week - Ronda will send Shareholder Minutes, Director Minutes, and Bylaws for e-signatures - Asks if Doug has substantive changes on subscription agreement or investor questionnaire **Draft Reply Created:** Yes Waiting for your review and approval before sending. Draft saved to draft_queue.json. **Status:** Pending your review
Iridium Follow-up: Draft Ready for Review
medium
Gregory Malakoff (Iridium, gregory.malakoff@iridium.com) replied to confirm he will send calendar invite for NDA/VAD paperwork. Thread summary: **Timeline:** - Jan 9: Gregg reached out with meeting availability - Jan 9: Doug confirmed 2 PM Eastern time slot - Jan 9 (2:42 PM): Gregg sent datasheets for 9704 transceiver + Iridium IMT service. Requested corporate name and address for NDA/VAD paperwork. - Jan 9 (2:47 PM): **Latest** — Gregg confirms will send calendar invite **Status:** Positive lead. Gregg is actively moving forward with NDA/VAD agreement setup. **Action Required:** 1. Review and approve the draft response (saved to draft queue) 2. Provide your official corporate address for paperwork **Draft Message:** Thank Gregg for the call, confirm we are interested in the 9704 transceiver specs, and provide corporate info (Name: FarmTech LLC + Address: [pending])
APPROVE: Draft Reply to Geco Strategic Weed Management
medium
Greg Stewart (Geco) asked to catch up on March 6th to complete weed mapping/predictive weed control discussion. Draft created: Confirms call availability and expresses interest in FarmDefender integration. Status: PENDING YOUR REVIEW Thread ID: 19cafb8b9135d5e5 Draft ID: r-geco-slies-follow-up-158946a89a5d
Review & Send: Windy Prairie Farms FarmDefender Response
medium
Pat from Windy Prairie Farms (windyprairie@itstriangle.com) expressed interest in FarmDefender for his 120ft boom on JD 4430. Draft response created highlighting Capstan integration, boom benefits, and local support. Ready for your review and approval to send. **Customer:** Windy Prairie Farms (Pat) **Equipment:** 120 ft boom on JD 4430 with Capstan **Interest:** Wants to learn more about FarmDefender **Draft Location:** /data/Sandbox/agents/email_agent/state/draft_queue.json **Draft ID:** r-windy-prairie-farmddefender-120ft-03-04-2026 **Case ID:** 16
BMO Topcon Program Dealer Agreement — Draft Reply Ready
medium
**Case:** BMO Bank N.A. (formerly Bank of the West) financing program dealer agreement **Status:** Awaiting signature and return **Timeline:** - Dec 30, 2025: Tamara Mallmann (VP, Program Manager) sent dealer agreement - Feb 2, 2026: Tamara sent follow-up asking for status - Feb 19, 2026: Doug replied committing to review and sign by Feb 25 deadline **Action:** Draft reply created and saved to draft_queue.json (r-bmo-topcon-dealer-agreement-followup-03-04-2026). Draft is pending your review and approval. **Draft Content:** Professional acknowledgment of follow-up, confirmation that agreement is under review with authorized officer, commitment to return shortly. **Next Steps:** Review draft, approve for send, and ensure signed agreement is returned to tamara.mallmann@bmo.com.
Jack Harris Immigration: Reply from Suzanne Cree (Leibl & Kirkwood)
medium
**From:** Suzanne Cree <Suzanne@usimmigrationlaw.net> **Subject:** RE: Udpated letter **Date:** Feb 2, 2026 **Summary:** Brief acknowledgment that updated I-140 employment letter was received. Suzanne confirmed receipt with a simple "Thanks" response. **Context:** Doug sent updated immigration letter on FarmTech letterhead with signature for Jack Harris PERM/green card case (PERM #G-100-24127-0-963040, Priority Date May 6, 2024). **Status:** Draft reply created and saved to draft_queue.json for Doug to review and approve before sending. **Action:** Review draft reply and approve/send when ready.
COMMS: Provide HTML verbiage for Soil Report Summary email
medium
David Cimbalista on Trello is asking for HTML email content for the Soil Report Summary card. Review the card and provide the requested email verbiage. Trello card: https://trello.com/c/x5neAwz2/88-soil-report-summary Board: FarmIQ
Adobe Photography Plan Auto-Renewal - March 16, 2026
medium
Adobe subscription reminder: Photography plan (20GB) will renew automatically on March 16, 2026 for $119.88/yr. Decide if you want to keep it or cancel. Can manage via https://www.adobe.com/go/account
World Ag Expo Follow-up: Billy Grenfell (Valley Irrigation) — No Recent Reply Found
medium
Job #846 indicated a customer reply from Billy Grenfell about World Ag Expo/AgSense 365 follow-up. However, reviewing the thread shows: Thread Status: - Billy Grenfell initial contact: Feb 19, 2026 — AgSense 365 VRI platform inquiry - Doug replied 4 times (Feb 19, 25, 26 twice) with various responses - Doug's last message (Feb 26, 8:15 AM EST): Politely declined, saying VRI is not a fit but offered to stay connected Current Status: No new reply from Billy since Feb 26. The conversation appears closed. Action Needed: Please clarify if there is a new reply from Billy that I should respond to, or if this is stale job data.
Email Draft Ready: Nick Hamill — USDA Bridge Payments
medium
Nick Hamill replied to your USDA Bridge Payments email with updates on his regen ag work, carbon programs, and R&D credits exploration. He also asked about your weed seed detection camera progress and mentioned winter weather conditions. **Nick's Topics:** - Working with Tanner Dyer on carbon side - Exploring regen ag program dollars - Investigating R&D credits while things are slow - Noting the lack of snow and winter precipitation **Draft Status:** Pending your review - Draft ID: r-nick-hamill-usda-bridge-followup-03-04-2026 - To: nchamill19@gmail.com - Thread: 19c862b554ab8a53 - Last email from Nick: Feb 22, 2026 4:35 PM MT Draft engages with all his topics and maintains the friendly, personal tone of the conversation.
Review & Send: Redekop Harvest Intelligence Follow-up
medium
Justin Regier (Redekop Manufacturing) reply in Harvest Intelligence Platform thread. The team had a call on Feb 27 to discuss the weed seed detection proposal. Draft follow-up email is ready for your review and approval: **Draft ID:** r-redekop-harvest-intelligence-followup-03-04-2026 **To:** jregier@redekopmfg.com CC: dmayerle@redekopmfg.com **Preview:** Thanks for confirming the meeting time on the 27th. I appreciate you and Dean taking the time to walk through the Harvest Intelligence Platform proposal. Let me know what next steps make sense from your end... **Status:** Case #12 created, tracking this business development opportunity. NDA status: NOT SIGNED (Justin signed Feb 17, you declined to countersign March 2). The draft is in /data/Sandbox/agents/email_agent/state/draft_queue.json if you want to review before sending.
Review & Send: Nathan White Topcon AGS2 Reply
medium
Customer reply received in Topcon RMA thread (19cb5f9ced7837ff). Nathan provided shipping address for Kinnamon Ridge Dairy LLC, Reedsburg WI. Draft reply created in draft queue (draft_id: r-nathan-topcon-ags2-49031f87d159). This is a brief thank-you confirming Topcon will send RMA number and shipping label. Ready for Doug to review and send.
Review & Approve Draft Reply to Gail Fenn (Topcon)
medium
Gail Fenn confirmed receipt of Nathan Whites shipping address for AGS-2 RMA. Draft reply asking for RMA number, shipping label timeline, and follow-up contact info after Gails departure (March 27). Draft ready in draft_queue: topcon-gail-follow-up-fca3b8e46eff Support case #1 updated to "awaiting_rma_and_label" status with full timeline. Email thread: 19cb5f9ced7837ff
Git merge conflict - manifest rebuild
medium
Manifests rebuilt and deployed successfully, but git push failed due to merge conflicts in: - WeedMapper/output/doug/{T01BLOCK,T08,T09,W07}/weed_heatmap.png (binary conflicts) - WeedMapper/pull_all_fields.py - WeedMapper/sync_boundaries.py - WeedMapper/weedmapper_spatial.py - farmiq.ai/farm/data/boundaries/doug/{T01BLOCK,W03,Z03}.geojson State: merge in progress. Manual resolution needed.
Action Required: Request SoilOptix credentials from David
medium
Task #296 approved — SoilOptix credentials are needed to enable the daily data sync. **What David needs to provide:** - SOILOPTIX_EMAIL (his SoilOptix account email) - SOILOPTIX_PASSWORD (his password) **Where to add them:** Recommended: Add to /data/agentpi/.env: ``` SOILOPTIX_EMAIL=david@example.com SOILOPTIX_PASSWORD=his-password ``` Alternatively: Create /data/Sandbox/SoilOptix/.env (copy from .env.example) **What this enables:** - Daily SoilOptix data sync via systemd timer - Pulls Customer → Farm → Field → Set → Points hierarchy - Stores at /data/soiloptix_data/ (2TB drive) - Test with: python3 /data/Sandbox/SoilOptix/soiloptix_sync.py --status **API Info:** - API: https://api.soiloptix.com - Swagger: https://api.soiloptix.com/swagger/index.html - Auth: POST /api/v3/login with email + password → Bearer token **Next Steps:** 1. Reach out to David (david@farmtech.us) 2. Get his SoilOptix login credentials 3. Add them to /data/agentpi/.env 4. Test the sync: python3 /data/Sandbox/SoilOptix/soiloptix_sync.py --status **Reference:** - Task #301 has setup instructions - Script: /data/Sandbox/SoilOptix/soiloptix_sync.py - Contact: Jessica Tipping (jessica@soiloptix.com) for partner program questions
INBOUND INQUIRY: Emil Svensson - Visual Communication Collaboration
medium
Contact: Emil Svensson (emil_svensson@LIVE.COM) Type: Project-based collaboration inquiry Skills: Visual communication, infographics, complex systems explanation Interest: FarmTech projects, particularly Messium-related materials Summary: Emil is completing a Bachelors degree in Media and Communication Studies and starting a Masters program. He's offering to contribute through project-based collaboration, focusing on visual materials and explanatory graphics. Offered to share CV and portfolio. Draft Reply Created: Professional acknowledgment drafted, awaiting your approval. Next Step: Review the draft reply. If approved, reply will be sent from support@farmtech.us.
Navigation Redesign Decision Needed
medium
User feedback #20 on field page T07: "menu bar on top. Not super keen on all the different tabs/pages. Need to think on that more. I want this whole system to be super clean and lean and really make sense when you are using it." Current top nav has 8 items (Dashboard, Reports, Crop Plan, Spray Input, Records, FSA Report, Field Audit, Import). User wants cleaner/leaner navigation. Options to consider: 1. Consolidate related pages (e.g., merge Spray Input + Records into one Spray section) 2. Move less-used items to dropdown/hamburger menu 3. Create primary/secondary nav levels 4. Reduce to core pages only (Dashboard, Field Audit, Import) with others as sub-pages Need your design direction on which approach fits your vision for a "super clean and lean" system.
Doug Weist ISOXML: 199/200 files are corrupted .BIN files
medium
Batch 2 processing complete: 199 files skipped (BAD_FILE - not valid ZIP archives), 1 timeout. Issue: Most Doug/Dan Weist ISOXML files are raw .BIN binary files from older John Deere equipment, not ZIP archives. Current processor expects ZIPs. Status: - WEIST,DOUG: 974 pending ISOXML (many corrupted .BIN) - WEIST,_DAN: 28,700 pending ISOXML (similar) Need binary ISOXML .BIN processor for older JD formats, or mark these files as unsupported.
Doug Weist ISOXML Batch 1 Complete - Processing Issues
medium
Processed 200 files from Doug Weist GDrive: ✗ 0 successful ✗ 199 .BIN files skipped (BAD_FILE) - proprietary JD format, not ZIP archives ✗ 1 TASKDATA.XML timed out after 180s - very large dataset DECISION NEEDED: 1. Increase timeout for large TASKDATA files? 2. Develop .BIN file processor for John Deere proprietary format? 3. Filter future batches to TASKDATA.XML only and skip .BIN files? Current approach cannot process these .BIN files as ZIP archives.
Deploy farm app map fix
medium
Fixed field map initialization errors by adding: - Leaflet library load check - Map container existence validation - Enhanced error logging - Empty GeoJSON handling File changed: farmiq.ai/farm/templates/field.html Needs deployment: No FTP credentials available in .ftp_config.json. Farm app deployment method unclear (not in main deploy.py manifest). Commit: c3f3f60c
CN1 Yield Data Extraction - Need Decision on Approach
medium
Working on Job #661 (CN1/YLD yield data processing). CNH .cn1 files use proprietary binary format. Options: 1. Install .NET runtime (dotnet-sdk) manually from Microsoft repos - would let us use the official CNH SDK DLL 2. Reverse-engineer the binary format in Python (slow, may miss fields) 3. Use a cloud service or Windows VM with .NET to extract data 4. Check if CNH Pro 700 can export to CSV/Shapefile directly Recommendation: Install .NET SDK (option 1) - most reliable and future-proof. Blocked on this decision to proceed with Doug's 2025 harvest data.
Dan Weist GDrive Processing: ISOXML Structure Issue
medium
Processed 200 pending files for weist,_dan (batch 11/18). Results: • 0 successfully processed • 7 timeout errors (large TASKDATA.xml > 180s) • 193 skipped (175 BAD_FILE, 14 NO_BIN, 4 NO_DATA) ROOT CAUSE: Individual .bin files are tracked/processed separately in the manifest, but ISOXML processing requires complete TASKDATA directories (TASKDATA.xml + all .bin files together). Current state: • Total Dan Weist files: 31,271 • Still pending: 27,599 (mostly ISOXML) • Successfully processed: 2,559 • Failed/skipped: 1,113 RECOMMENDATION: Modify scan_client_drives.py to: 1. Group ISOXML files by TASKDATA directory 2. Process entire directories as single units 3. Mark all component files (xml + bins) together Most data is 2015 Sprayer X30 export with thousands of jobs.
GDrive Processing Complete: 20 files processed, scanner needs fix
medium
Processed Doug Weist GDrive data: ✅ COMPLETED: - 5 yield shapefiles (wheat/barley harvest) - 15 boundary/soil shapefiles (SoilOptix texture maps) ⚠️ ISSUE FOUND: - 986 files still "pending" are individual .BIN files from ISOXML directories - These can't be processed standalone (need ZIP with TASKDATA.XML) - File scanner should skip .BIN files with extension filter 📊 CURRENT STATUS: - 392 files successfully processed - 986 pending (98% unprocessable .BIN files) - 6 errors (SoilOptix CSVs misclassified as yield data) 💡 RECOMMENDATION: Update scan_client_drives.py to exclude .BIN files during scan phase, or add to skip rules.
Git push fails - need SSH key added to GitHub
medium
**Problem:** Cannot push 37 commits (8.84 GB repository) via HTTPS - consistently times out with "unexpected disconnect while reading sideband packet" error after 2-5 minutes. **Root cause:** Repository is very large (8.84 GB packed objects) and HTTPS has timeout issues with large pack transfers. **Solution:** Add SSH key to GitHub account for faster, more reliable pushes. **Action needed:** 1. Go to https://github.com/settings/keys 2. Click "New SSH key" 3. Paste this public key: ``` ssh-ed25519 AAAAC3NzaC1lZDI1NTE5AAAAILVqXmDEwqcNSPNYS5ZNHgsu3A1M5YK8rdaoBwx6a48Q agentpi@farmtech ``` 4. Title: "AgentPi" 5. Save Once done, I can switch the remote to SSH and push successfully. **Temporary workaround:** Continue working locally, commits are safe. Will push when SSH is set up.

Email Drafts 27

To: thiago.junqueira@bayer.com
2026-03-09
Re: Farmtech/FieldView
Hi Thiago, Week of March 23rd works great. I'm flexible all week — mornings (8-11am MT) or afternoons (1-4pm MT) both work. Pick a time that's conve...
To: jcsaquet@hotmail.com
2026-03-09
Re: Topcon Parts
JC, On the Global-D subscriptions — I can transfer them to your account. Just need your Global-D account email and I'll contact Topcon support to mov...
To: Suzanne@usimmigrationlaw.net
2026-03-09
Re: Request for Evidence for Jack Harris
Suzanne, I provided financial documentation (tax returns and financial statements) when we submitted the petition last fall. Can you check the file t...
To: thiago.junqueira@bayer.com
2026-03-09
Re: Farmtech/FieldView
Hi Thiago, Week of March 23rd works great. I'm flexible all week — mornings (8-11am MT) or afternoons (1-4pm MT) both work. Pick a time that's conve...
To: jcsaquet@hotmail.com
2026-03-09
Re: Topcon Parts
JC, On the Global-D subscriptions — I can transfer them to your account. Just need your Global-D account email and I'll contact Topcon support to mov...
To: Suzanne@usimmigrationlaw.net
2026-03-09
Re: Request for Evidence for Jack Harris
Suzanne, I provided financial documentation (tax returns and financial statements) when we submitted the petition last fall. Can you check the file t...
To: jcsaquet@hotmail.com
2026-03-09
Re: Topcon Parts
JC, On the Global-D subscriptions — I can transfer them to your account. Just need your Global-D account email and I'll contact Topcon support to mov...
To: ricardo.pinto@montana.edu
2026-03-09
Re: World Agri-Tech San Francisco 2026
Ricardo, Thanks for sending this over. You're right — looks like a solid event, but the ticket price is steep. Let me take a look at the agenda and s...
To: spencer@messium.co.uk
2026-03-09
Re: Unavailable for meeting today
Spencer, Apologies for the delayed response. Tomorrow works for me. Looking forward to catching up on the trial results and 2026 planning. See you t...
To: spencer@messium.co.uk
2026-03-11
Re: VRA usage in Montana
Hi Spencer, Good question. Based on our customer base, I'd estimate roughly 40-50% of our growers have VRA capability — either their own equipment or...
To: jim@openprairie.com
2026-03-11
Re: farmtech
Jim, Thanks for getting back. Let's target Monday, March 16 at 2:00 PM MT. I'll send a Google Meet link. Looking forward to the conversation. Doug ...
To: jim@openprairie.com
2026-03-11
RE: farmtech
Jim, Perfect timing. Let's target Monday, March 16 at 2pm MT. I'll send a Google Meet link shortly. Looking forward to the conversation. Doug Weist...
To: jcsaquet@hotmail.com
2026-03-11
RE: Topcon Parts - Invoice
JC, Invoice attached. $500 total for the parts we discussed: - Value Line spline kit - 4x Fendt Combo harnesses (modified) - 1x control-only X consol...
To: jim@openprairie.com
2026-03-11
RE: farmtech
Jim, Monday, March 16 at 1:30pm MT works great on my end. Looking forward to telling you more about what we're building. I think you'll find the Far...
To: jcsaquet@hotmail.com
2026-03-11
Re: Topcon Parts
JC, $500 works for me. I'll send an invoice this week. Payment by check or Zelle — whichever is easier on your end. Doug Weist (406) 594-2767 doug@...
To: justinkrause95@gmail.com
2026-03-12
FarmTech Install Paperwork — Justin Krause
Hi Justin, Thanks for reaching out. Here is what I have on file from your install: FarmTech Invoice Summary: - Invoice Date: April 17, 2025 - Invoic...
To: David.Pinheiro@nordson.com
2026-03-12
List Pricing — Spot Spray Cables 4679800.200 & 4679800.201
Hi David, We are building out our ARAG Flowtron spot spraying configurations and need list pricing on two cables from Francesco's connection diagram:...
To: David.Pinheiro@nordson.com
2026-03-12
List Pricing - Spot Spray Cables 4679800.200 and 4679800.201
Hi David, We are building out our ARAG Flowtron spot spraying configurations and need list pricing on two cables from Francesco connection diagram: ...
To: jcsaquet@hotmail.com
2026-03-12
Re: Topcon Parts
JC, QuickBooks invoice is attached — $500 for the lot (Value Line spline kit + 4 Fendt combo harnesses + 1 control-only X console harness). Payment ...
To: jcsaquet@hotmail.com
2026-03-12
Re: Topcon Parts
JC, QuickBooks invoice attached for the parts — $500 total: • Value Line spline kit • 4x Fendt Combo harnesses (modified) • 1x control-only X console...
To: David.Pinheiro@nordson.com
2026-03-12
List Pricing - Spot Spray Cables 4679800.200 and 4679800.201
Hi David, We are building out our ARAG Flowtron spot spraying configurations and need list pricing on two cables from Francesco's connection diagram:...
To: David.Pinheiro@nordson.com
2026-03-12
List Pricing - Spot Spray Cables 4679800.200 and 4679800.201
Hi David, We are building out our ARAG Flowtron spot spraying configurations and need list pricing on two cables from Francesco's connection diagram:...
To: David.Pinheiro@nordson.com
2026-03-12
List Pricing - Spot Spray Cables 4679800.200 and 4679800.201
Hi David, We are building out our ARAG Flowtron spot spraying configurations and need list pricing on two cables from Francesco's connection diagram:...
To: David.Pinheiro@nordson.com
2026-03-12
List Pricing - Spot Spray Cables 4679800.200 and 4679800.201
Hi David, We are building out our ARAG Flowtron spot spraying configurations and need list pricing on two cables from Francesco's connection diagram:...
To: ricardo.pinto@montana.edu
2026-03-14
Re: World Agri-Tech San Francisco 2026
Ricardo, I wanted to run something by you. I've been looking at the NSF-USDA joint funding opportunity for agricultural robotics — the Foundational R...
To: case_reply@topcon.com
2026-03-24
Re: A new Topcon Ag case has been created: Case #01813694 - thread::wR6aFFHbedWPie3gCtosCSI::
Hi Alex, To answer your questions: 1. PWM valve calibration — Yes, we performed the Valve AutoCal. That is how we identified the issue — the belt sp...
To: Desiree.Wolken@t-mobile.com
2026-04-07
RE: T-Mobile | FarmTech
Hi Desiree, looping Jared back in as well. Apologies for the late reply — things got away from me during spring. I would like to get this moving agai...

Live Activity

Loading...

Feedback 3 new

🐛
There is no way to just mark the support ticket solved User: Doug Weist
command-center · 2026-03-16T23:10
new
🤔
What the fuck is this? This should be entering pounds or bushels and then calibrated the data. some weird factor is a monitor thing
farm-dashboard · 2026-03-12T02:38
new
🐛
Wher eis the button to take a picture and add a product? Or is that just available on mobile?
farm-dashboard · 2026-03-11T19:47
new
🤔
the season progress.... shouldn't boundaries be first? Can't do shit without a boundary
farm-dashboard · 2026-03-05T14:39
fixed
🤔
Way too many boundaries to look at at once. Not sure how to fix it but its a little overwhelming.
field-audit · 2026-03-02T02:55
fixed
🐛
Getting an error when making a report.
farm-dashboard · 2026-03-01T16:26
fixed
🐛
More drop down button not working.
farm-dashboard · 2026-03-01T16:25
fixed
🐛
Spray drip down menu doesn’t work
farm-dashboard · 2026-03-01T16:25
fixed
🐛
on the image with the drain flows, it seems like the water looks like its flowing on to the field, not off, The boundary doesn't stop the water, its just the field boundary
farm-dashboard · 2026-03-01T14:59
deferred
🐛
where are you getting March 31 is USDA planting intentions deadline? We don't do that, we plant the crops then turn in planting reports, usually due by June 15 or maybe even July
farm-dashboard · 2026-03-01T14:56
fixed

Recent Commits

e1397049 Docs: Pre-Plant Scout memory, context, and crop plan feedback 3 days ago
61c55766 FarmBoss: Pre-Plant Spray Scout — satellite weed detection for burndown decisions 3 days ago
c446a459 olihllii 6 days ago
fc30ef2d ouhouh 9 days ago
a231d07e hhhhh 9 days ago
cda73ae4 Email actions, AgentPi, QuickBooks, PDF specs, context and memory updates 9 days ago
082f6690 FarmIQ: PWA setup, dashboard, FarmBoss, and configurator updates 9 days ago
0bad1024 Starlink: add RTK Bridge firmware and spec 9 days ago

Operations

Storage
--
Uptime
--
Data Pipeline
--
Google Drive
--

Cost History (30 days)

Daily Cost
7-day Avg

Agent Spending

System Health --

Efficiency

Job Queue 0 queued → Task Board

No jobs in queue. Submit one above or via CLI.

My List 1

SIGN & RETURN Redekop NDA — your signature block on page 5 is blank. Send countersigned copy to jregier@redekopmfg.com high

Chat

Ask anything.
preview

Loading...

Shutdown AgentPi

This will stop all agents, sync filesystems, and power off. You'll need physical access to turn it back on.

Send Feedback